Is collecting rainwater illegal in Malaysia?

Is collecting rainwater illegal in Malaysia?

Despite the development of local water resource management and the amendment to the Federal Constitution, no provision has been made to rainwater harvesting in the Malaysian legal framework.

What is the cost of rainwater harvesting?

However the cost varies widely depending on the availability of existing structures like wells and tanks which can be modified and used for water harvesting. Typically, installing a water harvesting system in a building would cost between Rs 2,000 to 30,000 for buildings of about 300 sq.

Who is in charge of water supply in Malaysia?

Ministry of Energy, Green Technology and Water
Within the executive branch of the federal government, the Ministry of Energy, Green Technology and Water is in charge of setting water supply and sanitation policies. It is assisted by two technical agencies under its supervision: The water supply department (JBA) and the sewerage services department (JPP).

How is Malaysia water supplied?

Streams and rivers with and without impounding reservoirs contribute 98 percent of total water used in Malaysia; the remainder is contributed by groundwater. River flow regimes are irregular and to secure safe yield from surface water sources, storage facilities were constructed.

Who is responsible for water supply and sanitation in Malaysia?

Service provision is clearly separated between water supply on the one hand and sanitation on the other hand. Since the 2006 reforms all water supply assets in peninsular Malaysia are owned by the Water Asset Management Company (WAMCO), called Pengurusan Aset Air Berhad (PAAB) in Malaysian.

What was the percentage of rural water supply in Malaysia?

Beginning with the 3rd Malaysia Plan (1976-1980) rural water supply also received a much needed boost. The share of households in Peninsular Malaysia receiving treated water in both urban and rural areas rose from 23% in 1950 to 85% in 1990.

Who is the Department of irrigation and drainage in Malaysia?

The Water Resources Management and Hydrology Division of the Department of Irrigation and Drainage (DID), Ministry of Water Resources and Environment, Malaysia would like to express sincere appreciation to USAINS Holding Sdn.

How did the Klang Valley water crisis affect Malaysia?

Only months after the 1998 Klang Valley water crisis, the Sungai Tinggi Dam had been completed with a capacity of 475 megaliters per day, thus increasing the supply to the Klang Valley by about 80%. The dam was part of the first phase of the Selangor River water supply project.

About the Author

You may also like these